Bathers Way, Emergency Rock Breaking


Newcastle Beach, NSW

Overview

Responding to a rockfall risk identified by the University of Newcastle. In collaboration with City of Newcastle and Tetra Tech Coffey, BEEP carried out targeted rock-breaking works to reduce the risk of further rockfall along a popular coastal path.


The project was a direct response to recent geotechnical monitoring, aiming to stabilise a hazardous rock face and reinstate public safety.

About this Project

 Client: City of Newcastle
Capability: Geotechnical Stabilisation / Rock Breaking
Location: South Newcastle Beach, NSW
Duration: 3 days (with partial area closures for safety) 

Get in Touch

Scope of Work

 

  • Work with guidance from City of Newcastle and Tetra Tech Coffey engineers
  • Responded to a rockfall risk identified by the University of Newcastle
  • Use of a 30-tonne excavator with hammer and bucket attachment
  • Using site won material and some import ENM to create a pad to enable reach to the top of the problem rock area
  • Reduced the height of an unstable rock column over three days
  • Managed works adjacent to the Bather’s Way shared path
  • Operated under partial area closure for safety
  • Restored the cliff side batter, site and rock mattress back to engineers specifications

Summary

Over a focused three-day period, BEEP safely carried out rock-breaking works to reduce the height of an unstable column along Newcastle’s coastal path. Working under partial closures and close supervision from engineering consultants, the team used a 30-tonne excavator to stabilise the site without impacting surrounding assets. 


Site access was carefully managed, and the area was reinstated to engineering specifications using a mix of site-won and imported ENM materials — restoring both safety and structural integrity to the cliff face. 

    Related Projects

    River Levee Restoration, Burraga Island, Terara

    Terara, NSW

    Copyright © 2025 ^Brown Environmental Earthworks Planning Pty Ltd - All Rights Reserved.


    Contact:  0410 436 968    |    info@beepservices.com.au

    • Home
    • Blog
    • Contact Us
    • Who we are
    • What we do
    • Our Projects