Newcastle Beach, NSW
Responding to a rockfall risk identified by the University of Newcastle. In collaboration with City of Newcastle and Tetra Tech Coffey, BEEP carried out targeted rock-breaking works to reduce the risk of further rockfall along a popular coastal path.
The project was a direct response to recent geotechnical monitoring, aiming to stabilise a hazardous rock face and reinstate public safety.
Client: City of Newcastle
Capability: Geotechnical Stabilisation / Rock Breaking
Location: South Newcastle Beach, NSW
Duration: 3 days (with partial area closures for safety)
Over a focused three-day period, BEEP safely carried out rock-breaking works to reduce the height of an unstable column along Newcastle’s coastal path. Working under partial closures and close supervision from engineering consultants, the team used a 30-tonne excavator to stabilise the site without impacting surrounding assets.
Site access was carefully managed, and the area was reinstated to engineering specifications using a mix of site-won and imported ENM materials — restoring both safety and structural integrity to the cliff face.
Copyright © 2025 ^Brown Environmental Earthworks Planning Pty Ltd - All Rights Reserved.
Contact: 0410 436 968 | info@beepservices.com.au